# How long does a bathroom refit take?

> A full refit of an average UK bathroom usually takes one to three weeks, depending on how much changes and whether pipes, walls or electrics are moved. Smaller jobs are much quicker: re-lining a shower with wall panels or replacing a toilet can often be done in a day. The fastest refits are the ones where every material is on site before the old bathroom comes out.

It is the first thing most people ask, because a bathroom out of action is hard to live with. The honest answer depends on what is being done, so here is how the time breaks down, with timings from our own jobs in Eastbourne.

## Typical timings

- **A new toilet or basin:** a few hours.
- **A shower re-lined with wall panels:** usually one day.
- **A new bathroom floor:** one to two days, including lifting and refitting the toilet.
- **A full refit, same layout:** about one to two weeks.
- **A full refit with a new layout, moved pipework or a wet room:** two to three weeks or more.

## What the time goes on

A full refit happens in stages, and each stage has to finish before the next one starts:

- Strip-out: the old suite, tiles and floor come out.
- First fix: new pipework, and any electrical changes by a qualified electrician.
- Walls and floor: boarding, levelling and waterproofing where needed.
- Tiles or wall panels, then the new floor.
- Second fix: the toilet, basin, shower and taps go in and are connected.
- Sealing, painting and the final clean.

Drying times are the hidden part of the schedule. Adhesive, grout, levelling compound and plaster all need time before the next layer goes on, and rushing them is how tiles crack and seals fail.

## Examples from our own jobs

Our job photos carry the time they were taken, so these are real gaps, not estimates:

- A tiled shower in Eastbourne, lined with marble-effect panels: the before photo was taken just before midday, the after photo just before six the same evening.
- A toilet replaced in a flat in Eastbourne: before and after photos under three hours apart.
- A bathroom in Eastbourne with a new floor and a panelled shower: before and after photos ten days apart.

![Before: the toilet removed and old pipework exposed, in a flat in Eastbourne](https://homefixngo.com/media/blog/202611/4fd2df8ed70c5ff1-1600.jpg)

![After: the same room under three hours later, with a new toilet fitted and the pipework boxed in](https://homefixngo.com/media/blog/202611/ec481e986bb58850-1600.jpg)

## How to keep a refit on time

- Choose everything before work starts: suite, taps, panels or tiles, floor and paint.
- Have the materials delivered and checked before the old bathroom comes out. A missing tile or a cracked basin can stop a job for days.
- Plan any electrical work early, so the electrician’s visit fits between the stages.
- Expect surprises behind old tiles and under floors, such as rotten boards or an old leak, and keep a little time spare.

## Questions we get asked

### Can I use my bathroom during a refit?

Not during the main works. If it is your only bathroom, ask how a toilet will be kept working overnight, and plan somewhere to shower for the noisiest days.

### Do I need to move out for a bathroom refit?

Usually not, as long as there is a plan for a toilet in the evenings. For a whole-flat refurbishment it can be easier to stay elsewhere.

### Can a bathroom be done over a weekend?

Small jobs, yes: a new toilet, a basin or shower panels. A full refit cannot be squeezed into a weekend without cutting corners on drying times.

Planning a bathroom? Send us a photo on WhatsApp and we will tell you how long your job would take, with a free fixed quote. More on our [bathrooms and plumbing service](https://homefixngo.com/services/bathrooms-plumbing/).