CallWhatsAppFree quote

Real jobs, real photos

Our work

Every photo here was taken on the job by our team. No stock images. We add new jobs as we finish them.

Before and after, on video

Short clips filmed on the job, from the first day to the finished room. Tap to play.

  • Eastbourne · 34 s

    A bay-window room in Eastbourne, before and after

    The old red carpet and wallpaper came out, the walls were painted grey with a patterned feature wall, the woodwork white, and a wood-effect floor went down.

  • Eastbourne · 35 s

    A bathroom in Eastbourne, before and after

    A dated bathroom with a black-and-white tiled floor and a tiled shower: a grey tile-effect floor, and the shower lined with marble-effect panels and gold trim.

  • Norfolk · 29 s

    A room in Norfolk, from bare plasterboard to finished

    Part of a building converted into rooms: new plasterboard walls filled and painted white, and a dark wood-effect floor laid.

  • Norfolk · 52 s

    Rooms and a shower room in Norfolk, stripped out and finished

    A stripped-out building turned into finished rooms, with new walls and floors and a shower room lined with marble-effect panels.

  • Hotel refurbishment

    The Milverton Hotel, Manchester

    A whole hotel taken from bare rooms to finished, including its new café. The job behind our hotel and guest house work.

    Job 01

    Location
    Manchester
    Starting point
    Bare rooms
    Included
    Guest rooms and the hotel’s new café

    Read the case study

    Finished attic guest room at the Milverton Hotel: grey headboard, mustard cushion and a crystal ceiling lightEn-suite at the Milverton Hotel with marble-effect wall panels and a bath with a glass screen
  • Bathrooms · Eastbourne

    Shower re-lined in a day

    A tired tiled shower, lined with marble-effect panels and gold trim. Tiles in the morning, a new-looking shower by the evening.

    Job 02

    Location
    Eastbourne
    Work
    Tiled walls lined with marble-effect panels and trim
    Time
    Same day

    Bathrooms and plumbing

    After: the same shower lined with white marble-effect panels and gold trimBeforeAfter
    Drag to compare. Taken on the day, before and after.
  • Plumbing · Eastbourne

    Toilet replaced

    The old toilet and pipework came out, a new toilet went in and the pipes were boxed away. Same day.

    Job 03

    Location
    Eastbourne
    Work
    Old toilet and pipework out, new toilet fitted, pipes boxed in
    Time
    Same day
    Before: toilet removed, old pipework exposed and tools on the floorAfter: new toilet fitted, pipework boxed in and the room cleared
  • Bathrooms · Eastbourne

    Bathroom refit

    A dated bathroom with a black-and-white tiled floor and a tiled shower. The floor was replaced with a grey tile-effect floor and the shower lined with marble-effect panels and gold trim.

    Job 04

    Location
    Eastbourne
    Work
    New floor, shower lined with marble-effect panels and trim
    Photos
    31 December 2025 and 10 January 2026

    Bathrooms and plumbing

    After: the same bathroom with a grey tile-effect floorBeforeAfter
    The same view, before and after. Drag to compare.
    Before: old white-tiled shower with stained groutAfter: the shower lined with white marble-effect panels and gold trim
  • Refurbishment · Eastbourne

    Flat refurbishment

    A flat in Eastbourne refurbished room by room. In the bathroom, the walls were papered in a bold leaf print and a wood-effect floor went down. The same corner, nine days apart.

    Job 05

    Location
    Eastbourne
    Shown
    Bathroom, before and after
    Photos
    1 and 10 July 2026

    Flat and room refurbishments

    After: the same corner with leaf-print walls and a wood-effect floorBeforeAfter
    The same corner, before and after. Drag to compare.
  • Refurbishment · Eastbourne

    Room refurbishment

    A bay-window room with a worn red carpet and old wallpaper. The carpet came up, the walls were stripped and painted grey, the woodwork white, and a wood-effect floor went down, with a patterned feature wall.

    Job 06

    Location
    Eastbourne
    Work
    Strip-out, painting, feature wall, new floor
    Photos
    21 January and 4 February 2026

    Painting and decorating

    After: the same bay window with grey walls, white woodwork and a wood-effect floorBeforeAfter
    The same bay window, before and after. Drag to compare.
  • Conversion · Norfolk

    Building converted into rooms

    A building stripped back and turned into finished rooms with their own shower rooms. New plasterboard walls, white paint and dark wood-effect floors throughout.

    Job 07

    Location
    Norfolk
    Work
    Strip-out, new walls, decorating, floors, shower rooms
    Photos
    October to December 2025

    Flat and room refurbishments

    After: the same room with white walls, a dark floor and the fireplace keptBeforeAfter
    The same room, before and after. Drag to compare.
    During: a room with new plasterboard walls, filled joints and no floor yetFinished: a white room with a dark wood-effect floor
  • Bathrooms and plumbing

    Shower valve replaced

    The shower had failed behind the tiles. We opened the wall, replaced the pipework and the valve, and put the tiles back.

    Job 08

    Work
    Wall opened, new pipework and shower valve, tiles refitted
    Time
    Same afternoon
    Trades
    Plumbing and tiling

    Bathrooms and plumbing

    After: shower wall re-tiled with a new chrome shower valve fittedBeforeAfter
    Drag to compare. Taken on the day, before and after.
  • Bathrooms and plumbing

    Accessible WC refit

    The old pan and boxing came out and a new toilet went in between the grab rails, connected and sealed.

    Job 09

    Work
    Old toilet and boxing removed, new toilet fitted and connected
    Time
    Within the hour
    Trades
    Plumbing
    Before: accessible toilet removed and floor strippedAfter: new toilet fitted between the grab rails
  • Plumbing and flooring

    New radiator pipework

    Floorboards lifted under the window, a new copper run taken to the radiator, and the floor made ready to close up.

    Job 10

    Work
    Boards lifted, new copper pipework to the radiator
    Trades
    Plumbing and flooring

    Flooring

    Floorboards lifted under a window with new copper pipework running to a radiator

Want yours done like this?

Send a photo and we'll come back with a fixed price, usually the same day.