Real jobs, real photos
Our work
Every photo here was taken on the job by our team. No stock images. We add new jobs as we finish them.
Before and after, on video
Short clips filmed on the job, from the first day to the finished room. Tap to play.
A bay-window room in Eastbourne, before and after
The old red carpet and wallpaper came out, the walls were painted grey with a patterned feature wall, the woodwork white, and a wood-effect floor went down.
A bathroom in Eastbourne, before and after
A dated bathroom with a black-and-white tiled floor and a tiled shower: a grey tile-effect floor, and the shower lined with marble-effect panels and gold trim.
A room in Norfolk, from bare plasterboard to finished
Part of a building converted into rooms: new plasterboard walls filled and painted white, and a dark wood-effect floor laid.
Rooms and a shower room in Norfolk, stripped out and finished
A stripped-out building turned into finished rooms, with new walls and floors and a shower room lined with marble-effect panels.
Hotel refurbishment
The Milverton Hotel, Manchester
A whole hotel taken from bare rooms to finished, including its new café. The job behind our hotel and guest house work.
Job 01
- Location
- Manchester
- Starting point
- Bare rooms
- Included
- Guest rooms and the hotel’s new café


Bathrooms · Eastbourne
Shower re-lined in a day
A tired tiled shower, lined with marble-effect panels and gold trim. Tiles in the morning, a new-looking shower by the evening.
Job 02
- Location
- Eastbourne
- Work
- Tiled walls lined with marble-effect panels and trim
- Time
- Same day
BeforeAfterDrag to compare. Taken on the day, before and after. Plumbing · Eastbourne
Toilet replaced
The old toilet and pipework came out, a new toilet went in and the pipes were boxed away. Same day.
Job 03
- Location
- Eastbourne
- Work
- Old toilet and pipework out, new toilet fitted, pipes boxed in
- Time
- Same day


Bathrooms · Eastbourne
Bathroom refit
A dated bathroom with a black-and-white tiled floor and a tiled shower. The floor was replaced with a grey tile-effect floor and the shower lined with marble-effect panels and gold trim.
Job 04
- Location
- Eastbourne
- Work
- New floor, shower lined with marble-effect panels and trim
- Photos
- 31 December 2025 and 10 January 2026
BeforeAfterThe same view, before and after. Drag to compare. 

Refurbishment · Eastbourne
Flat refurbishment
A flat in Eastbourne refurbished room by room. In the bathroom, the walls were papered in a bold leaf print and a wood-effect floor went down. The same corner, nine days apart.
Job 05
- Location
- Eastbourne
- Shown
- Bathroom, before and after
- Photos
- 1 and 10 July 2026
BeforeAfterThe same corner, before and after. Drag to compare. Refurbishment · Eastbourne
Room refurbishment
A bay-window room with a worn red carpet and old wallpaper. The carpet came up, the walls were stripped and painted grey, the woodwork white, and a wood-effect floor went down, with a patterned feature wall.
Job 06
- Location
- Eastbourne
- Work
- Strip-out, painting, feature wall, new floor
- Photos
- 21 January and 4 February 2026
BeforeAfterThe same bay window, before and after. Drag to compare. Conversion · Norfolk
Building converted into rooms
A building stripped back and turned into finished rooms with their own shower rooms. New plasterboard walls, white paint and dark wood-effect floors throughout.
Job 07
- Location
- Norfolk
- Work
- Strip-out, new walls, decorating, floors, shower rooms
- Photos
- October to December 2025
BeforeAfterThe same room, before and after. Drag to compare. 

Bathrooms and plumbing
Shower valve replaced
The shower had failed behind the tiles. We opened the wall, replaced the pipework and the valve, and put the tiles back.
Job 08
- Work
- Wall opened, new pipework and shower valve, tiles refitted
- Time
- Same afternoon
- Trades
- Plumbing and tiling
BeforeAfterDrag to compare. Taken on the day, before and after. Bathrooms and plumbing
Accessible WC refit
The old pan and boxing came out and a new toilet went in between the grab rails, connected and sealed.
Job 09
- Work
- Old toilet and boxing removed, new toilet fitted and connected
- Time
- Within the hour
- Trades
- Plumbing


Plumbing and flooring
New radiator pipework
Floorboards lifted under the window, a new copper run taken to the radiator, and the floor made ready to close up.
Job 10
- Work
- Boards lifted, new copper pipework to the radiator
- Trades
- Plumbing and flooring

Want yours done like this?
Send a photo and we'll come back with a fixed price, usually the same day.





