When should a guest house be refurbished? A winter plan
The short answer
Refurbish in the quiet months, roughly November to March, and do it room by room so the rest of the house keeps taking bookings. Start with the rooms that get the most complaints or earn the most, do bathrooms and floors first because they take longest, and book the trades in autumn so the work is finished before the Easter and summer bookings arrive.

Guest houses and small hotels in a seaside town like Eastbourne earn most of their money between spring and early autumn. A week with a room out of action in July costs far more than the same week in January. That is why the refurbishment season is winter.
Plan the order
- Rooms with complaints first. A dated bathroom or a worn carpet mentioned in reviews costs bookings every week it stays.
- Best-selling rooms next. Sea-view and larger rooms earn the most, so they pay back fastest.
- Bathrooms and floors early. They take longest and cause the most disruption, so do them while the house is quiet.
- Corridors and the breakfast room last. They can often be done in a few days, even early in the season.
Work room by room
There is no need to close. One or two rooms come out of service at a time, are finished completely, and go back on sale before the next ones start. The rest of the house keeps trading, and guests see finished rooms, not building work.

At the Milverton Hotel in Manchester our team took the whole building from bare rooms to finished, including en-suites like this one. The same room-by-room approach works for a six-room guest house.
What makes the biggest difference to guests
- The bathroom: clean grout or new wall panels, a strong shower, good seals and no mould.
- The wall behind the bed: a fresh colour or a feature wall changes the whole room in photos.
- The floor: a worn carpet makes even a clean room feel tired.
- Small fixes: sticking doors, loose handles and dripping taps all end up in reviews.
Book early
Winter diaries fill up in autumn. Get quotes in September or October, agree the order of rooms and the dates, and choose the materials before work starts, so nothing waits on a delivery.
Questions we get asked
How long does it take to refurbish one guest room?
Redecorating with a new floor can take a few days. Add an en-suite refit and it is usually one to two weeks. Ask for dates for each room before work starts.
Can the work be done while guests are staying?
Yes, if it is planned: agree quiet hours for noisy work, keep the work area closed off, and make sure it is cleaned at the end of each day.
Do you refurbish guest houses outside Eastbourne?
Our base is Eastbourne and we cover up to 20 km around it, including Seaford, Pevensey Bay and Bexhill-on-Sea. For hotel work we have gone further, as at the Milverton Hotel in Manchester.
More on our hotel and guest house refurbishments.
More advice

· 2 min read
How can I make a bathroom safer for an older parent?
Start with the changes that prevent falls: grab rails by the toilet and in the shower, a non-slip floor, good lighting and a shower seat. If climbing into the bath is the problem, replacing it with a level-access or low-tray shower makes the biggest difference. Councils can help pay for some adaptations through a Disabled Facilities Grant, usually after an assessment by an occupational therapist.
Read the answer →
· 2 min read
Why is my laminate floor lifting or swelling?
Laminate lifts in a ridge when it has no room to expand, and it swells when water gets into its joints. The usual causes are a missing gap at the walls, spills or a leak, damp coming up from a concrete floor, or an uneven base. Boards that have only lifted can often be relaid; boards with swollen edges cannot be dried back and have to be replaced.
Read the answer →
· 2 min read
Why is my shower leaking through the ceiling below?
Most leaks from a shower into the room below come from four places: tired sealant where the tray meets the wall, cracked grout, a loose or failed waste under the tray, or the pipes and valve behind the wall. Stop using the shower, let the ceiling dry, and check the sealant and grout first: they are the most common cause and the simplest to put right.
Read the answer →